Главная News of logistics (English) When Building a New DC or Leasing an Existing One, Many Factors to Consider in Terms of Physical Design

Фрагмент из кейса

ЗАО «Гончар» расположено в г. Москве. Производит керамическую продукцию, в основном облицовочную керамическую плитку, что составляет более 85%. Кроме...
Компания Асе Dairies специализируется на доставке на дом молока, молочных продуктов и некоторых других товаров этого ассортимента. Последние 12 лет за...

When Building a New DC or Leasing an Existing One, Many Factors to Consider in Terms of Physical Design

Font Size Larger Font Smaller Font
Рейтинг пользователей: / 0
ХудшийЛучший 
Материал из категории  News of logistics (in English)
09.03.2010 23:45

As there are growing signs that the economic recovery is real, with increasing unit volumes soon a umber of companies will find that the capacity of their current distribution center is not sufficient to meet current or expected needs in terms of throughput, storage capacity, or other operating requirements.

As we've reported before, sizing a new DC is as much art as it is science, and is heavily dependent on the forecast of someone at the company about where sales and unit/case volumes are going to go over the next 3-5 years. 

In addition to questions around size and throughput needs, companies also need to consider their potential requirements for or interest in materials handling automation when building new or leading an existing buildings. The designs of some facilities are simply more well suited than others in terms of support for materials handling systems inside them. Certainly if a greenfield facility is being planned, companies need to think deeply about what automation may be deployed and the resulting physical facility requirements before any final agreement with an architect or builder.

While it is almost always possible to add at least some level of automation to an existing building (you can now even literally "raise the roof" of many DCs, solving the low clear height restriction that used to be a nearly absolute barrier to sortation systems in some buildings), certain building designs may be inherently less friendly to automation, leading to limitations in system design, and/or higher costs for automate.

This topic is especially pertinent right now, as DC floor space is generally available in most markets at very low rates versus pre-recession days - and therefore may look especially cheap versus building a new facility, as those costs have not come down nearly as much.

 

Below, take a few minutes to consider a number key building design criteria that should be considered to optimize distribution center performance whether you are building or leasing an existing facility, considering automation or not.

Size: While size is an obvious factor, there are several considerations often overlooked when determining square footage requirements. The first is the opportunity to reduce total building costs by going up to increase cube, rather than out (see "Building Height" below). The second is that while material handling automation such as picking and carton sortation systems can deliver significant productivity gains, it also takes floor space that must be planned for when building or leasing a new facility.

Building Height: A traditional "spec" building will have a clear height of 24 to 26 feet, tall enough for 4-high pallet storage racking. However, as it is usually less expensive to build up rather than out, and maximizing storage capacity is an almost universal goal, the trend today for companies commissioning their own facility is to build with a clear height of 32 feet or even greater. At this height, 6-high pallet storage can be used, with some companies going even higher to achieve 8-level storage rack configurations. In most municipalities, fire safety codes have being written to permit ESFR (Early Suppression, Fast Response) ceiling mounted sprinkler systems to be installed in buildings of this height in place of in-rack fire sprinkler systems.

Floor Flatness: Standard warehouse floors will support normal fork truck movement and activity, but are generally used with conventional, wide-aisle storage configurations (12-foot aisle between racking). Standard floors may preclude use of narrow aisle (8-foot aisles) and are definitely not acceptable for very narrow aisle (5-6 foot aisle) technology, which require so-called "very flat" and "super flat" floor construction, respectively. While these floors are more expensive to install and can add weeks to the project schedule, the long-term gains in storage cube, operator productivity due to faster travel speed, and reduced truck maintenance are often worth the one-time initial building cost. To make this decision, an analysis is required to determine total storage requirements and the optimum rack configuration by comparing building cost, the cost of specialized lift truck equipment, pallet storage density, and expected worker productivity.

It is today now possible to have existing floors improved to "super flat" levels, but obviously this is more expensive than building the floor that way to begin with.

Column Grid Pattern: The traditional 40-foot by 40-foot building column spacing is rarely optimum for an engineered DC.  Roof support columns should always be located in the flue space in-between racks.  However, with any of the narrow aisle approaches a standard grid will rarely allow the columns to be buried in the rack, resulting in a significant loss of storage positions.  It is also frequently desirable to make the first bay extra deep to eliminate columns that impede fork truck traffic on the dock, by moving the first column row back to 60-70 feet away from the doors.

Roof Reinforcement: It is often possible to hang portions of a material handling automation system from the ceiling rather than using floor supports.  This can both provide for greater movement of vehicles and people around and through the system, as well as allow those portions of the system to occupy otherwise "dead space," such as above a traffic aisle.  However, the ability to hang conveyors and other equipment is generally dependent upon having defined sections of the building roof structure strategically reinforced during construction to take a greater load per square foot.

A "spec" building will almost never have reinforced roofing. An empty building previously occupied by another tenant may, but likely not consistent with your specific needs. More than you would think, even companies building new DCs don't get this question answered early enough in the process. While roof reinforcement can usually be added later, it will be a lot more expensive to do so than at the time of construction. That should also be considered in the lease versus build decision.

Dock Doors: The typical warehouse building has receiving doors on one side of the building, and shipping doors across on the other side.  While this flow-thru design is often the best configuration, it is sometimes better to look at other arrangements.  For example, placing receiving and shipping doors on the same side of the building may allow both functions to share sortation equipment, using one set of diverts to sort received cartons for palletizing and put-away, and another to build outbound customer orders.  Another advantage is that you can provide one common and secure space for both delivery and pickup drivers to congregate.   While there is usually flexibility to add doors even to a spec building, the final arrangement of doors needs to be closely tied to the material handling system layout, especially for fluid loading and unloading applications.

Lighting: Lighting should be placed so that it hangs directly above storage and pick aisles, which will rarely be the case if lighting is in place before the storage system has been designed and laid out

Clearly, there are a number of factors that go in to deciding whether to build or lease a DC and the optimal location for a new facility, including roads, taxes, parking, and many other attributes. Compromises often have to be made.

But making sure you have thought through the operational impacts of existing facility designs, and how the facility design now or in the future will help or hinder adding material handling automation in the DC, will usually save money and allow more options for getting the total system that right for you.

 

Source: http://www.scdigest.com/

 



Последние похожие материалы:
Более поздние похожие материалы:

Обновлено 16.10.2016 19:52
 

Последние новости на сайте

Элеваторы для обработки зерновых культур находят широкое применение в фермерских хозяйствах, аграрных предприятиях. С их помощью...
Давайте розглянемо різні типи ламп та основні параметри, які важливо враховувати при їх...

Авторский сайт в сфере логистики Logistics-GR

Пример материалов из категории "Задачи по логистике"

Основной завод компании J&R Softdrink занимающийся разливом по бутылкам имеет мощность 80000 л в день и работает без выходных....
Исходные данные для расчета: время в наряде = 12 ч; нулевой пробег = 4 км; расстояния: = 5 км; = 6 км; = 4 км; = 6 км; = 4 км. Техническая...

Facebook-страница

Фрагмент из задачи

Произвести расчет для сдельной, переменной и для схемы расчета на условную расчетную единицу транспортной работы. Исходные данные для расчета: — тарифная...
Определить среднее расстояние перевозки на основании следующих данных: = 20 тыс. т; = 40 тыс. т; = 30 тыс. т; = 10 тыс. т; = 10 км; =...

 

Группа на Linkedin

(более 4000 участников)

Группы на Facebook

 

Узнать о проекте Logistics-GR

 youtube-канал  

 

Результаты тестов

Последние результаты
<-->Стоит ли Вам выбирать профессию менеджера по логистике? 64.00 %
<->(Лог-М) Тема 10. Складська логістика (10 тест.завдань) 40.00 %
<->(Log) Test 01. Warehouse and Logistics (10 tests) 90.00 %
Перейти к тестам
Проект работает
15 years, 2 months, 1 days.
Исходные данные для расчета: время в наряде = 12 ч; нулевой пробег = 4 км; расстояния: = 5 км; = 6 км; = 4 км; = 6 км; = 4 км. Техническая...
Произвести расчет предельного, технического и целевого тарифов при общем, пессимистическом и оптимистическом материалопотоке, а также...
Обосновать оптимальное число погрузчиков, необходимое для загрузки автомобилей, прибывающих на склад (базу) по следующим...
Определить выгодность применения автомобиля грузоподъемностью 5,0 т по сравнению с автомобилем 4,0 т при следующих условиях:...
Методы маршрутизации перевозок делятся на маршрутизацию перевозок помашинных отправок и маршрутизацию перевозок мелких партий грузов. В зависимости от...
Вид складирования предполагает выбор технологического оборудования, на котором складируется груз, и форму размещения его в пространстве складского...
Требования (спрос, заявки) на доставку грузов получателям со складов поставщиков, станций или портов можно рассматривать, как потоки событий. Потоком...
При организации перевозочного процесса объектом управления является локальная подвижная система автомобиль — водитель, которая работает в условиях...
Millicra Electronic Components — крупный поставщик запасных частей для автомобильной отрасли. До 1997 г. ее операции в основном осуществлялись в...
В Европе контрактная логистика уже развилась в самостоятельный бизнес. По оценкам Datamonitor, общие логистические издержки в 1999 г. составили 150 млрд...
Hotpoint — крупный поставщик бытовых электроприборов из Великобритании, принадлежащий General Electric. В 1988 г. компания действовала как независимая,...
Perman Frere — небольшой производитель, располагающийся в Брюсселе. Большую часть своей продукции экспортирует и для этого имеет склад готовой продукции...

Logistics-GR - теория и практика логистики и транспорта

Copyright © 2009 - 2024. При использовании материалов сайта - гиперссылка обязательна. All Rights Reserved. По всем вопросам обращаться - email